Summer cold water, winter hot water, water temperature management for the construction and civil engineering industry OKM-CHN series.
Temperature management of mixing water in summer and winter maintains the quality of on-site mixing materials!
【Features】========================== ◆Stable supply of optimal mixing water temperature for construction sites! Equipped with cooling and heating functions, it can be used regardless of summer or winter. ◆Eco function significantly reduces preparation time to about 25 minutes! It was common to think, "Since we will start pouring at 8:30 after the morning meeting, we need to prepare by 4 AM." Thanks to the eco function, the cooling time from about 30°C to about 10°C has been shortened to approximately 25 minutes. ◆A wide variety of tank sizes to choose from! ============================== Feel free to contact us.
- Company:岡三機工
- Price:1 million yen-5 million yen